Do you need a demolition permit in Hot Springs, Arkansas?

Yes, if the building sits inside the Hot Springs city limits. The city has its own demolition permit application. City Engineering also wants a call before the water and sewer lines are cut. Outside the city, Garland County generally does not issue building permits. The state asbestos rule and Arkansas 811 still apply.

Do you need a demolition permit inside the Hot Springs city limits?

Yes. The City of Hot Springs publishes a demolition permit application, and the Building and Permits Division handles it. The form covers commercial and residential jobs, plus partial rehabilitation. You fill in owner and contractor details, the project value, the square footage and a job description. The building official signs it last.

The city takes permit applications through its online permit portal. The fee is not printed on the application itself. It comes from the city’s Permit Fee Schedule, so confirm the amount when you apply. The division answers at 501-321-6851. National cost guides put a standard house demolition permit at $100 to $450 or more. That is a market range, not the city’s number.

Two signature lines are easy to miss: the receipt of the procedure sheet, and the historic review line. House and garage demolition runs in a set order. Permit first, then utility disconnects, then the asbestos question, then machines.

Who shuts off the utilities before the machines start?

The property owner or the applicant calls the utility providers, and the contractor closes out the water and sewer service. The city’s demolition sheet puts those requests on the property owner or the applicant. That means electric, gas, city water and sewer, phone and cable. All of it happens before a machine touches the building.

City Engineering asks for about a 24-hour head up at 501-321-6654 or 501-321-6861. Water and sewer staff then meet the contractor on the job. Water, sewer and pressure sewer lines are cut and capped at or within 10 feet of the property line. The city inspects the termination and GPS marks it for the next build. Have the water meter turned off before the teardown. On a lot with a grinder station, the power to it goes off first.

Arkansas 811 comes before any digging or demolishing work. Member utilities locate their lines within two full working days. Dial 811 or 1-800-482-8998. The ticket is good for ten working days from the day you call it in. National guides suggest starting utility termination requests 2 to 4 weeks ahead.

Do you need an asbestos inspection to tear down a house?

Plan on it in Hot Springs. The city’s demolition procedure sheet says Regulation 21 requires an inspection of any building or structure for asbestos before demolition, and it puts that check on the applicant. The state rule’s own facility definition excludes residential buildings with four or fewer dwelling units. Several common situations still pull a house back under the rule.

DEQ words it a little differently. Its asbestos page lists institutional, commercial, public, industrial and residential structures, excluding certain residential structures. Those get inspected before a demolition. The inspection has to be done by an asbestos inspector certified in the State of Arkansas.

Benton’s demolition packet shows what counts as a trigger. Its form asks eight yes or no questions. They cover fire training, and several houses taken down in one project. They cover a house demolished inside a commercial or public project, and a house used for business. The last one asks whether utilities run to the structure. One yes, and Regulation 21 applies, so an asbestos report is required.

When the rule applies, a written Notice of Intent goes to DEQ. It is filed at least ten working days before demolition begins, even if no asbestos is present. The notice fee is nothing at one square or linear foot of asbestos material or less. It is $75 above that, and $375 at 160 square feet or 260 linear feet or more. A pre-demolition asbestos inspection runs $300 to $900 in national cost guides. Older houses are the ones worth testing. Put it in the budget with what a teardown costs around Hot Springs.

What if the building sits in the Central Avenue Historic District?

Downtown buildings get a second review. Inside the Central Avenue Historic District, exterior changes beyond minor maintenance need a Certificate of Appropriateness. That certificate comes from the Historic District Commission. The demolition of any structure on the site lands in Category 4, the new construction and demolition class.

Category 4 runs through a public hearing. Completed material goes to Planning Department staff 20 days before the next commission meeting. Staff set the hearing date. Property owners within 150 feet of the site get notified. You or a representative appears at the hearing to answer questions. Staff issue the certificate after the commission approves it.

The city demolition permit still applies on top of that review. The 20-day filing window sits in front of the hearing. A downtown teardown needs a longer runway than one out on a county road.

What do the other cities around Hot Springs require?

It depends which side of a city line the building is on. Hot Springs, Benton, Bryant, Malvern and Arkadelphia each run their own permit desk. Unincorporated Garland County generally does not issue building permits. Hot Springs Village adds a property owners association review on top.

Where the building sitsWhat it takes before demolition
Hot Springs, inside the cityCity demolition permit through the Building and Permits Division, a call to City Engineering for the water and sewer cut, historic review where it applies
Unincorporated Garland CountyThe county generally does not issue building permits. A bill of assurance or covenants can still control the lot. Circuit Clerk 501-622-3630. City permits can reach one mile past the city limits
Hot Springs VillagePOA Permitting and Inspections, 501-922-5562. Demolition is not on the published permit list, so call before anything comes down
BentonUtilities disconnect permit and demolition permit. A $75 sewer demo permit at Benton Utilities, sewer inspection at 501-776-5930, gas shut off through the Summit builders hotline, 1-800-555-6322. No burning allowed
BryantPlanning and Development, 501-943-0488. Construction permits are applied for online
MalvernBuilding permits are applied for online. Demolition is not one of the listed forms, so call the Building Department at 501-332-3638
ArkadelphiaThe Building Official issues a permit before any demolition under Unified Development Code 2.2.1. A permit expires after 180 days unless work is in progress. Building Department 870-246-9864

Mobile home demolition and removal follows the same city rules as a house. Ask the local permit desk which form covers a manufactured home, because the answer changes from town to town.

Can you burn the demolition debris instead of hauling it?

Not while a burn ban is posted, and one is up on both sides of the city line. The City of Hot Springs has a burn ban alert posted. Garland County has had one across its unincorporated areas since August 14, 2026. Benton allows no burning of demolition debris at all. The debris gets loaded and hauled either way.

The Garland County Landfill takes construction and demolition waste as Class 4. That rate is $32 per ton with a $15 minimum, set January 1, 2025. Waste that comes from outside Garland County is $50 per ton. Scrap iron and steel go in at no charge on unmixed loads.

Burnt debris costs more, not less. The landfill prices it as Class 1 household waste, at $37.40 per ton with a $12 minimum. Ash contents are call for pricing. For demolition work in Hot Springs, the dump fee is simply part of the job.

Do you need a permit for the grading and the slab work after?

Often yes, once dirt starts moving. Inside the city, no one does excavation or grading without a permit from the city engineer. One exemption covers an isolated, self-contained area of one half acre or less. It applies where there is no apparent danger to property. Stormwater rules start at one acre.

The grading fees are printed in the city code. A non-engineered permit is $50 under an acre. Above an acre it is $50 for the first acre. Add $25 for each additional acre, up to $275 per permit. An engineered permit with plans is $100 under an acre. Above that it is $100 for the first acre plus $50 each added acre, to a $550 cap.

The city stormwater permit covers any land disturbance between 1 and 5 acres. Over 5 acres, a state permit applies as well. Any commercial land disturbance needs it regardless of size, and so does any disturbance next to a water body. Unincorporated Garland County has its own rule. Work disturbing more than one acre but less than five in unplatted areas needs a stormwater plan. So does any lot in a platted subdivision.

Concrete slab and driveway removal is its own line on a teardown. Old slabs and drives break out with the same excavator, then the hole gets backfilled and leveled.

A real number comes from looking at the lot: the access, the utilities and what is coming down. Tell us what you want gone, and we will come out and price it. Call (501) 617-1511 or ask for a free on-site estimate.

Frequently asked questions

How much is a demolition permit in Hot Springs?
The city does not print the demolition fee on the application form. It comes from the Permit Fee Schedule that the Building and Permits Division links. Confirm the amount when you apply, at 501-321-6851. National cost guides put a standard house demolition permit at $100 to $450 or more.
How long does it take for a demolition permit to be approved?
Hot Springs does not publish a turnaround time, so ask the Building and Permits Division what they are running. National cost guides put permit applications at 2 to 8 weeks. The one fixed clock in Arkansas is the asbestos Notice of Intent, filed at least ten working days ahead.
Are building permits required everywhere in Arkansas?
No, it depends on the city or the county. Unincorporated Garland County generally does not have building codes and does not issue building permits. Arkadelphia makes it unlawful to start demolition before the Building Official issues a permit. Hot Springs permits can reach one mile past the city limits.
What is on the Hot Springs demolition permit application?
The form asks whether the job is commercial, residential or a partial rehabilitation. You fill in owner and contractor details, the project address, the project value, the square footage and a job description. Then come signature lines for the procedure sheet, historic review, the applicant and the building official.
Do I need a permit to demolish my mobile home?
Inside a city, plan on the same permit desk that handles a house teardown, plus the same utility disconnects. Outside the city limits in Garland County, no county building permit is issued. Call the local permit office first, because which form covers a manufactured home changes from town to town.
Who turns off the utilities before demolition?
The property owner or the applicant requests disconnection from the electric, gas, water and sewer, phone and cable providers. City Engineering wants about a 24-hour head up at 501-321-6654 or 501-321-6861. The contractor cuts and caps the water and sewer line, and the city inspects it and GPS marks the spot.
Do I need an asbestos inspection to tear down a house?
Plan on it in Hot Springs. The city's demolition procedure sheet says Regulation 21 requires an inspection of any building or structure before demolition, and puts it on the applicant. The state rule excludes residential buildings with four or fewer dwelling units, but utilities running to the structure or a commercial project pull a house back in.
Can I burn the demolition debris?
Not during a burn ban, and the City of Hot Springs and unincorporated Garland County both have one posted. Benton allows no burning of demolition debris at all. Burning also costs more at the landfill, where burnt debris is priced as Class 1 waste at $37.40 per ton.
Ready to Start Your Project?

Get In Touch With Scott Bankhead Demolition

A house that needs to come down, a lot that needs clearing, a slope that needs a wall? Call or send the form and we will look at the job with you and give you a free quote, teardown through cleanup, from one company.

Get a Free Estimate

Tell us about your project and we will get right back to you.

Call (501) 617-1511